EASY
CAT
IMPORTANT
Earn 100

If three taps are open together, a tank is filled in . One of the taps can fill in and another in . At what rate does the pipe work?
(a)Waste pipe emptying the tank is
(b)Waste pipe emptying the tank is
(c)Waste pipe emptying the tank is
(d)Fills the tank in

50% studentsanswered this correctly

Important Questions on Time and Work
EASY
CAT
IMPORTANT
There are two pipes in a tank. Pipe A is for filling the tank and Pipe is for emptying the tank. If can fill the tank in hours and can empty the tank in hours then find how many hours will it take to completely fill a half empty tank?

EASY
CAT
IMPORTANT
Abbot can do some work in days, Bill can do it in days and Clinton can do it in days. They start working in turns with Abbot starting to work on the first day followed by Bill on the second day and by Clinton on the third day and again by Abbot on the fourth day and so on till the work is completed fully. Find the time taken to complete the work fully?

EASY
CAT
IMPORTANT
and can do some work in days. and together do twice as much work as Calone and and together can do thrice as much work as alone. Find the time taken by to do the whole work.

EASY
CAT
IMPORTANT
There are three Taps and in a tank. They can fill the tank in and respectively. At first, all of them are opened simultaneously. Then after , tap is closed and and are kept running. After the hour, tap is also closed. The remaining work is done by Tap alone. Find the percentage of the work done by Tap by itself.

EASY
CAT
IMPORTANT
Two taps are running continuously to fill a tank. The tap could have filled it in hours by itself and the second one by itself could have filled it in hours. But the operator failed to realise that there was a leak in the tank from the beginning which caused a delay of one hour in the filling of the tank. Find the time in which the leak would empty a filled tank.

EASY
CAT
IMPORTANT
can do some work in days, can do it in days and can do it in days. They start working together. left after days and left after working for days. How many more days are required to complete the whole work?

EASY
CAT
IMPORTANT
A alone can complete a job in 4 days. He is twice as fast as while is twice as fast as . If all of them work together, in how many days would the job get completed?

EASY
CAT
IMPORTANT
men take days to complete a piece of work. They worked for a period of 8 days. After that, they were joined by more men. How many more days will be taken by them to complete the remaining work?