Arun Sharma Solutions for Exercise 2: Level of Difficulty

Author:Arun Sharma

Arun Sharma Quantitative Aptitude Solutions for Exercise - Arun Sharma Solutions for Exercise 2: Level of Difficulty

Attempt the practice questions from Exercise 2: Level of Difficulty with hints and solutions to strengthen your understanding. How to prepare for Quantitative Aptitude solutions are prepared by Experienced Embibe Experts.

Questions from Arun Sharma Solutions for Exercise 2: Level of Difficulty with Hints & Solutions

EASY
IPMAT: Rohtak
IMPORTANT

X takes 4 days to complete one-third of a job, Y takes 3 days to complete one-sixth of the same work and Z takes5 days to complete half the job. If all of them work together for 3 days and X and Z quit, how long will it take for Y to complete the remaining work done?

EASY
IPMAT: Rohtak
IMPORTANT

A completes 2/3 of a certain job in 6 days. B can complete 1/3 of the same job in 8 days and C can complete 3/4 of the work in 12 days. All of them work together for 4 days and then A and C quit. How long will it take for B to complete the remaining work alone?

EASY
IPMAT: Rohtak
IMPORTANT

Three diggers dug a ditch of 324m deep in six days working simultaneously. During one shift, the third digger digs as many metres more than the second as the second digs more than the first. The third digger’s work in 10days is equal to the first digger’s work in 14days. How many metres does the first digger dig per shift?

EASY
IPMAT: Rohtak
IMPORTANT

A, B and C working together completed a job in 10days. However, C only worked for the first three days when 37/100 of the job was done. Also, the work done by A in5 days is equal to the work done by B in 4 days. How many days would be required by the fastest worker to complete the entire work?

EASY
IPMAT: Rohtak
IMPORTANT

A and B completed a work together in 5 days. Had A worked at twice the speed and B at half the speed, it would have taken them four days to complete the job. How much time would it take for A alone to do the work? 

EASY
IPMAT: Rohtak
IMPORTANT

Two typists of varying skills can do a job in 6minutes if they work together. If the first typist typed alone for 4 minutes and then the second typist typed alone for 6minutes, they would be left with 1/5 of the whole work. How many minutes would it take the slower typist to complete the typing job working alone? 

EASY
IPMAT: Rohtak
IMPORTANT

Three cooks have to make 80idlis. They are known to make 20pieces every minute working together. The first cook began working alone and made 20pieces having worked for some time more than three minutes. The remaining part of the work was done by the second and the third cook working together. It took a total of 8minutes to complete the 80idlis. How many minutes would it take the first cook alone to cook 160idlis for a marriage party the next day? 

EASY
IPMAT: Rohtak
IMPORTANT

Mini and Vinay are quiz masters preparing for a quiz. In x minutes, Mini makes y questions more than Vinay. If it were possible to reduce the time needed by each to make a question by two minutes, then in x minutes Mini would make 2y questions more than Vinay. How many questions does Mini make in x minutes?